Did we answer Safra's flagged vendor questions?
Partly. The photodetector / vapor-cell blade part-number mix-up is resolved — Wale corrected the labels with IEC (photodetector = MQ2602-10302, VC blade = MQ2602-11103). Still open: TTM's technical-query round on the VC blade (Issue #13 + array-data approval; they also need the PO#/tape number to locate the part) — waiting on us since Safra's out. Confirm the answers went back to Tushar / TTM.
- Clock stability — decide how much PID-tuning effort we put in and whether we pull in on-site help; control-loop coupling is the real risk.
- Shared-hardware coordination — we had collisions on the same MQC-01 unit this week. One owner per unit + coordinate lab changes with Gaby & Newton.
- Robbie's parting analysis — MQC-02 likely must run away from the magic temperature; map stability vs. VCSEL temp to pick the operating point.